Projects
Lakeshore Gold Scale Pad Fabrication and Installation
Client: Lakeshore Gold
Location: Timmins, Ontario
SWM Contracting was contracted by Lakeshore Gold for the fabrication and installation of their on-site scale pad. SWM was responsible for all steps of the project from site prep through to completion.
William Day - Construction of New Shop
Client: William Day
Location: Northern Ontario
This project consisted of all Civil work, supply and erection of a Pre Engineered Behlen Building 50’ x 100’, the project was a turnkey project, the concrete floor had to be tapered to ensure all water, snow and ice that melted ran into the sump in the center.
- Main Mill Building was 136’ x 63’
- Log Sorter Building was 76’ x 52’
- Sorter Stacker Building was 160’ x 32’
- Debarker Building was 44’ x 15’
Eacom Saw Mill Rebuild
Client: Eacom
Location: Timmins
Following the 2012 fire that destroyed the main sawmill building at the Eacom Timber McChesney sawmill in Timmins, SWM was contracted to Supply and Erect a number of key buildings:
After the fire SWM was contracted to Supply and Erect the following buildings, there was a tight deadline to meet, as well as had to work in and around Mill Machinery that was not being replaced, and coordinate the new machinery coming in.
Small Log Debarker
Client: Domtar - Timmins Sawmill
Location: Timmins, Ontario
Installation of wave feeder, modification of existing live deck, relocated and modified existing chain conveyors, installation of debarker, modified and relocated existing belt conveyors.
Installation of Turbines and Generators
Client: Alstom Power Hydro
Location: Abitibi Consolidated - Iroquois Falls, Ontario
In December 2004, we completed a 1-year $2 million dollar project focusing on the installation and testing of nine turbines, complete with generators. SWM was responsible for all labour, equipment, supervision, and field management for this project.
Oxygen Line
Client: Various Mining Companies
Location: Northeastern Ontario
Several hundred fittings i.e. 90deg, 45deg, tees etc. All of the piping and fittings were degreased for oxygen service in house re packaged and shipped to site for installation. Please see pictures below of the different lines in a couple locations.
Mill Bank Transformer Replacement Project
Client: Abitibi Consolidated
Location: Iroquois Falls, Ontario
SWM was responsible for the fabrication and installation of a Millbank cable bridge, and associated steel work, concrete saw cutting, and civil work.
Water Treatment Plant and Pumphouse (Montcalm Project)
Client: AMEC - Falconbridge (Kidd Creek Division)
Location: Montcalm Mine Site - Timmins, Ontario
SWM was responsible for the supply, fabrication, and installation of the mechanical, piping and HVAC work.
Ganotec Server Room Project
Client: Ganotec
Location: Northern Ontario
SWM Contracting was hired to undertake all elements related to the construction of a Server Room for Ganotec's Operations and Maintenance building. This consisted erecting metal studs, dry walling, tape mud and paint, installing doors and flooring as well as plumbing, HVAC and electrical.
- Dismantling part of the stack. Shop fabricate, supply, inspect, test, and delivery and erection of the complete top part of the dryer stack.
- Supply and install new top part of stack including new ladders, platforms, stainless steel top and strakers.
- Shop paint total fabrication and touch-up field welds.
- Test all welding.
- Dismantle all existing Electrical, Instrumentation, and Piping components associated with the original stack to the cut elevation and reinstall as per the original design.
- Locate and install sufficient lifting brackets, temporary connections and stiffening devices necessary to ship, lift and install the partial stack without damages to it or other installations.
Dryer Stack Replacement
Client: Falconbridge (Kidd Creek Division)
Location: Kidd Creek Met Site - Timmins, Ontario
SWM Timmins had to comply with a project schedule requiring the work to commence during the smelter shutdown, and end nine days after the start date. The Dryer Stack Replacement Project consisted of the following:
Commercial renovation to Casey’s Restaurant
Client: Casey's Restaurant
Location: Timmins, ON
SWM Contracting completely renovated both the interior and exterior of the Casey’s Restaurant in Timmins, Ontario. The work included the development and construction of a completely new layout for the entire space.
Residential renovation to enable accessibility
SWM Contracting renovated a single family dwelling in order to make it barrier free. The project included interior renovations such as modifying the bathroom to make it completely wheelchair accessible along with exterior renovations including the design and construction of a wheelchair ramp.